Tuesday, June 11, 2019

Green Side Up

As promised, zoysia sod was delivered and installed throughout the golf course.  Nearly 3000 square-foot was installed on various fairways and tees.



The practice facility tee added 2,000 sqft today too! That makes it 20% larger!  First, the topsoil was graded out and checked with out transit.  Then 8 large rolls of sod was installed.  The surround will be sodded in the upcoming days pending rain tomorrow.






No comments:

Post a Comment