Rapid progress has taken place in the last two days!  Our contractor arrived on property Monday allowing us to push full speed ahead with our bunker renovation.  The machine being used is doing the final grading work inside the bunkers with a specialized bucket that can tilt side to side while scooping.  Check out this video for example!




Here are some photos of our process.  Shown is the left green side bunker on hole number 4.

Final Grade Shaping


Digging drainage ditch




Installing drainage pipe


Installing Polylast bunker liner system


Here are some more photos!










A lot more progress promised for tomorrow so check back often!!!