The practice facility tee added 2,000 sqft today too! That makes it 20% larger! First, the topsoil was graded out and checked with out transit. Then 8 large rolls of sod was installed. The surround will be sodded in the upcoming days pending rain tomorrow.
No comments:
Post a Comment